Services01
Industrial Execution & Field Services
The physical work: welding, assembly, installation, relocation, dismantling, maintenance.
This is the cluster where steel gets cut, welded, aligned, and commissioned. We field crews for certified piping and structural welding, mechanical assembly, and the precision installation of production equipment, and we carry the same discipline through renovations, relocations, and controlled dismantling.
Field work rewards preparation more than improvisation. Before a crew mobilizes, the scope is broken into work packages with defined tolerances, hold points, and handover criteria. That is what lets us commit to a schedule and keep it.

Certified welding
Piping and structural welding to certified procedures, shop and field.
Mechanical assembly
Assembly of industrial plant and equipment, skids, and modules.
Precision equipment installation
Installation, alignment, and levelling of machinery to specified tolerances.
Pre-commissioning & commissioning
Systematic checkout, functional testing, and handover to operations.
Renovations & revamps
Renovation and recommissioning of existing plant and production lines.
System relocation
Dismantling, transfer, and re-erection of complete production systems.
Dismantling & decommissioning
Controlled dismantling of equipment and systems up to full plant decommissioning.
Repair & upgrades
Mechanical and electrical repair, component upgrades, obsolescence work.
Industrial maintenance
Planned and corrective maintenance, servicing, inspection, and optimization.
Electrical & mechanical fit-out
Fit-out for energy and infrastructure facilities.
Soil stabilization & road base construction
In-situ stabilization of existing soils into a load-bearing base course, mix-in-place, without soil exchange or gravel import.
In-place road recycling
Milling and re-stabilizing existing roads and paved surfaces into a new base course, ready for surfacing.
How we run field work
Every mobilization starts from a work-package breakdown: scope, tolerances, hold points, inspection and test plan, handover criteria. Welding runs to certified procedures with full traceability from filler batch to weld map. Alignment and levelling are measured, recorded, and signed off against the equipment manufacturer's tolerances, not against habit.
The same structure carries into brownfield work. Relocations and revamps are sequenced around your production calendar, with dismantling documented so that re-erection is assembly, not archaeology.
From first weld to signed handover
We treat commissioning as part of execution, not as an afterthought. Pre-commissioning checks run in parallel with the final assembly stages, so that mechanical completion and functional readiness converge instead of queuing. The job is finished when your operators accept the system, and the documentation proves why they should.
Ground work before steel work
Not every site starts with a slab. Where roads, platforms, and laydown areas have to be built on weak or variable ground, we stabilize the existing soil in place: additive and binder are milled into the soil with a recycler, then the surface is graded and compacted into a load-bearing base course. No soil exchange, no gravel import, and none of the haul traffic that comes with them.
The mix design starts in the lab, from samples of the actual soil, and the finished base is verified the way the rest of our work is: load plate and compaction testing against defined acceptance values, documented and signed off before the next layer goes down. Delivered through the network, contracted through Sanbra.
Put a crew on it
Send the scope, the site, and the timeline. We come back with a delivery plan, work package by work package.

